We’re a Modern Architect Studio Based in London UK. We are the top 3 earners of 2012, each making over $400 million US Dollars in Fee Income.it has developed a passionate audience of more than 25 million active monthly users.
We’re a Modern Architect Studio Based in London UK. We are the top 3 earners of 2012, each making over $400 million US Dollars in Fee Income.it has developed a passionate audience of more than 25 million active monthly users and seemingly endless opportunities to shape the $300 billion designs.
Intermass applied for the Taking Over Certificate (TOC) from Arada for Nasma Phase 6, consisting of 25 villas (GF + 1F) in Al Tay, Sharjah.
Intermass achieved 2.7 million safe man hours on the Nest Accommodation project, which is part of the Al Jada Development in Sharjah.
Intermass achieved the fifth project control milestone by completing the block work for the last building of the Nest Accommodation project, which is part of the Al Jada Development in Sharjah. This project, which consists of 12 buildings (B + G + 5 + R), is being developed by Arada with Mimar as the Engineer.
Intermass has successfully handed over 108 apartment keys for the MISK 1 & 2 project (B + GF + 9) in Al Jada, Sharjah. This project is being developed by Arada with Arif & Bintoak as the Engineer.
Intermass started authority inspections for MISK 3 & 4 in the Al Jada Development, Sharjah. This project, which consists of two buildings (B + G + 9 + R), is being developed by Arada with Arif & Bintoak as the Engineer.
Intermass achieved a project control milestone for the MAG Eye townhouses project by installing the precast panels in the last villa at Zone B1 (51 townhouses).
Intermass achieved a project control milestone for the MAG Eye townhouses project by casting the last villa substructure in Zone A4 (32 townhouses).
Intermass obtained the permanent power connection for MISK 1 & 2 in the Al Jada Development, Sharjah. This project, which consists of two buildings (B + G + 9 + R), is being developed by Arada with Arif and Bintoak as the Engineer.
Intermass achieved a project control milestone for the MAG Eye townhouses project by casting the last villa substructure in Zone A3 (87 Townhouses). This project consists of 546 villas (GF + 1F) at Mohamed Bin Zayed City, Meydan in Dubai, with a challenging contract duration of 19 months. MAG Eye Real Estate Development is developing this project with VX Studio as the Engineer.
We’re a Modern Architect Studio Based in London UK. We are the top 3 earners of 2012, each making over $400 million US Dollars in Fee Income.it has developed a passionate audience of more than 25 million active monthly users.